Squamish FSR Closure:
April - mid-May, 2017: Major works at 22km (Mud Creek) of the Squamish River FSR scheduled. Exact closure dates TBD based on weather conditions; however, a complete closure of the site is planned and there will be no access around/beyond 22km for the duration of the project.
https://www.for.gov.bc.ca/dsq/engineering/roadinformation.htm
Found this out the hard way this weekend. The road is now closed at 22 km and will remain closed for at least 1 month. :(
Wish the MOF engineer responsible was an angler and left it open just 2-3 more weeks before freshet closes the fishery down anyway.
-
Wish the MOF engineer responsible was an angler and left it open just 2-3 more weeks before freshet closes the fishery down anyway.
Maybe he is an angler ;D
-
Ha!
-
I wonder if maybe what they're doing relates to freshet somehow and this is their only window.
-
LOL @Clarkii, you are probably right and it's all a ruse to keep the confluence all to himself!
Freshet is probably right, before it starts to really blow and not wanting to do in-stream work during the fall winter salmon season.
Shame they could not have done it earlier and through the winter season and kept the road clear of snow for us. :)